fastProject 4.11.7 Released

General

  • Can now select one of 5 different highlights colors (Yellow, Blue, Gray, Orange & Green) and the ability to name them. You also have the option to show today’s or all Highlighted tasks by color.

  • Can now expand multiple summary tasks, optionally hiding the completed tasks and a new option to only show the expanded summary tasks (while hiding everything else).

  • Add the ability to ad a Target Date when breaking down a task

  • Estimated Durations can now be used. To use, goto Options > General > Allow Estimated Durations

  • Prefix not added to Touchpoints, Checkpoints and Deliverables

Refresh - Roll-up

  • After a roll-up, if the Start and Finish dates do not match, the number of days difference is now reported.

  • Roll-up now automatically corrects when a micro-schedule has non-working time (and the macro-schedule doesn’t). It is possible date constraints are added to the Macro to align the dates in the Micro when the start date would occur on a weekend. To overcome this, the date constant is removed and the task duration if extended so the Finish dates align.

  • Improve circular dependency checking and reporting

  • Fixed bug where dates rolled-up were not the same if negative lags were used and the micro project was on a different calendar to the macro.

Analyzer

  • Added improved auto-fix for tasks updated in the future

Wigglechart

  • Fixed inconsistency in gap between Wigglechart and Dashboard

Inspector

  • Critical Path Analysis now only exports Action items with an Owner (general notes are now ignored)

  • Added ability to show All Predecessors including completed

  • Added Show Inactivated and Activate All options under the Inactivate dropdown

Report

  • Under Late Simulator, added ability to set Deadlines on selected Targets

FTTM Dashboard

  • Added a check to check for duplicate Wigglecharts in the Import file