fastProject 4.9.2 Released

General

  • Exporting Touchpoints, Checkpoints and Deliverables now only exports non-completed milestones

  • Filter task added to context menu

  • Fixed problem with the “All tasks” filter not found when performing a Reset when in the Resource Pool view

  • Fixed “flashing” when perform a Reset

Update

  • Overflow bug fixed when generating the Effort Report, which could happen when all tasks are earlier than the current date.

  • Fixed Find being set to “equals” rather than “contains” after going to linked task in the macro-micro roll-up

  • Fixed problem when running the PostFresh report where the PreFresh report was generated instead

Macro-Micro Roll-up

  • Improved functionality in macro-micro roll-up where predecessor dependencies now don’t have to flow down (a.k.a. in a waterfall fashion)

  • Going to a linked task in a macro-micro scenario, now only displays the task and subtasks if the roll-up task is a summary task. In addition, it setups up the screen with the splitter and position of the current date to the left.

  • Fixed bug in macro-micro roll-up where the start date of a macro task that doesn’t have a rolled-up predecessor and when the start/finish dates didn’t match with the micro task, would be set to the finish date of the micro task rather than the start date

  • Fixed problem when updating the progress of a macro task, where the micro task was a summary task with no current in-progress tasks (they were either not started or all in the future)

Inspector

  • Improved critical path interface in the Inspector when the number of Targets > 40

  • Minor formatting changes of the Critical Path Analysis chart

  • Added name of custom column in title when exporting Touchpoints/Checkpoints/Deliverables

Analysis

  • Bug fixed in duration analysis where blank lines would appear